#### Reproduction

Stackblitz demo:

https://components-issue-aypuzh.stackblitz.io

Steps to reproduce:
1. Create a MatDateRangePicker as shown in the docs
2. Add the dateChanged attribute to matStartDate or matEndDate
3. Start to change dates

#### Expected Behavior

What behavior were you expecting to see?

That the date changed attribute on matEndDate is only triggered when you change the end date. Or a way to detect when both start and end date have successfully been set.

#### Actual Behavior

What behavior did you actually see?

The date changed attribute on matEndDate is triggered both when you change the start and end date.
#### Environment

- Angular: 10.0.0
- CDK/Material: Material 10.0.0
- Browser(s): Chrome
- Operating System (e.g. Windows, macOS, Ubuntu): macOS

Hướng dẫn đóng góp

Mở hướng dẫn đóng góp

Hướng nghiên cứu

Bắt đầu với bản tái hiện StackBlitz được liên kết và ví dụ trong tài liệu Angular Material cho MatDateRangePicker, tập trung vào các trình xử lý dateChanged trên matStartDate và matEndDate. Tái hiện chuỗi sự kiện trong khi thay đổi từng ngày; được xem là hoàn tất khi trình xử lý matEndDate chỉ được kích hoạt đối với các thay đổi ngày kết thúc, hoặc cách được hỗ trợ để phát hiện cả hai ngày đã được thiết lập được ghi lại.

Do mô hình lập chỉ mục viết ra từ nội dung của issue.

Đánh giá

Công nghệ
angular, typescript
Lĩnh vực
frontend
Loại issue
Lỗi
Độ khó
3/5
Thời gian dự kiến
1-2 ngày
Mức độ hoạt động
Đình trệ
Độ rõ ràng
Khá rõ ràng
Mức phù hợp với người mới
35/100

Nhận issue mới trong hộp thư của bạn

Bản tóm tắt ngắn những issue GitHub phù hợp với người mới.