bug(mat-date-range-picker): MatEndDate dateChanged is triggered by changes to start and end date
- Vorherrschende Sprache
- TypeScript
- Sterne
- 25k
- Forks
- 6.8k
- Ø Merge
- 1 T. 8 Std.
- Gemergte PRs (30 T.)
- 91
Beschreibung
#### Reproduction
Stackblitz demo:
https://components-issue-aypuzh.stackblitz.io
Steps to reproduce:
1. Create a MatDateRangePicker as shown in the docs
2. Add the dateChanged attribute to matStartDate or matEndDate
3. Start to change dates
#### Expected Behavior
What behavior were you expecting to see?
That the date changed attribute on matEndDate is only triggered when you change the end date. Or a way to detect when both start and end date have successfully been set.
#### Actual Behavior
What behavior did you actually see?
The date changed attribute on matEndDate is triggered both when you change the start and end date.
#### Environment
- Angular: 10.0.0
- CDK/Material: Material 10.0.0
- Browser(s): Chrome
- Operating System (e.g. Windows, macOS, Ubuntu): macOS
Beitragsleitfaden
Rechercherichtung
Beginne mit der verlinkten StackBlitz-Reproduktion und dem Beispiel in der Angular-Material-Dokumentation für MatDateRangePicker und konzentriere dich auf die dateChanged-Handler von matStartDate und matEndDate. Reproduziere die Ereignisfolge, während du jedes Datum änderst; fertig ist die Aufgabe, wenn der matEndDate-Handler nur bei Änderungen des Enddatums ausgelöst wird oder die unterstützte Möglichkeit dokumentiert ist, zu erkennen, dass beide Daten gesetzt wurden.
Vom Indexierungsmodell aus dem Issue-Text verfasst.
Bewertung
- Tech-Stack
- angular, typescript
- Bereich
- frontend
- Issue-Typ
- Bug
- Schwierigkeit
- 3/5
- Geschätzter Aufwand
- 1-2 Tage
- Aktivitätsstatus
- Veraltet
- Klarheit
- Größtenteils klar
- Anfängerfreundlichkeit
- 35/100