hackjunction / hackjunction/JunctionApp
Event timeline fix
- Lingua principale
- JavaScript
- Stelle
- 78
- Fork
- 69
- Metriche di merge delle PR
- Nessuna PR unita negli ultimi 30g
Descrizione
If possible, the "application period ends" thing in the timeline could always have a higher priority on the timeline than the event itself. Atm the app organizes all the steps of the event automatically based on the date+time, but in online events it's good to stretch the application period so that it continues over the starting point of the event (so mainly a cosmetic thing).

Guida per i contributori
Apri la guida per i contributori
Direzione di ricerca
Start by locating the event timeline rendering and the logic that orders steps by date and time. Reproduce the online-event case shown in the attached image, then verify that the application-period end remains visually above the event start when the periods overlap.
Scritto dal modello di indicizzazione a partire dal testo della issue.
Valutazione
- Stack tecnologico
- javascript
- Ambito
- frontend
- Tipo di issue
- Bug
- Difficoltà
- 3/5
- Tempo stimato
- 1-2 giorni
- Stato di attività
- Ferma
- Chiarezza
- Abbastanza chiara
- Idoneità per principianti
- 35/100