Reduce Downtime through Upgrade Orchestration [GA]
- Langage dominant
- Aucune donnée de langage
- Étoiles
- 8.9k
- Forks
- 1.8k
- Métriques de merge des PR
- Aucune PR mergée en 30 j
Description
### Value Prop
Upgrading GitHub Enterprise Server now requires about 20 minutes less downtime. Starting with GHES 3.21, pre-upgrade steps that previously ran during the maintenance window can now be run beforehand, while the appliance is still serving traffic.
### Expected Outcome
Downtime during upgrades is one of the most significant friction points for GHES customers. Starting in 3.21, the pre-upgrade steps run while the appliance is still live, moving ~20 minutes of work outside the maintenance window and reducing total downtime accordingly.
Guide de contribution
Ouvrir le guide de contribution
Piste de recherche
No files, tests, or entry points are identified in the roadmap issue. Start by clarifying the GHES 3.21 upgrade workflow and implementation scope; done should mean the pre-upgrade work runs while the appliance serves traffic and reduces maintenance-window downtime by about 20 minutes.
Rédigé par le modèle d'indexation à partir du texte de l'issue.
Évaluation
- Stack technique
- github
- Domaine
- infrastructure, release
- Type d'issue
- Fonctionnalité
- Difficulté
- 5/5
- Temps estimé
- Plus d'une semaine
- Activité
- Calme
- Clarté
- À clarifier
- Accessibilité débutants
- 25/100