github / github/roadmap

Reduce Downtime through Upgrade Orchestration [GA]

Abierto
#1,314 0 comentarios 0 reacciones 0 asignados Ver en GitHub
GA GHES 3.22
Lenguaje dominante
Sin datos de lenguaje
Estrellas
8.9k
Forks
1.8k
Métricas de merge de PR
Sin PR fusionados en 30 d

Descripción

### Value Prop
Upgrading GitHub Enterprise Server now requires about 20 minutes less downtime. Starting with GHES 3.21, pre-upgrade steps that previously ran during the maintenance window can now be run beforehand, while the appliance is still serving traffic.

### Expected Outcome
Downtime during upgrades is one of the most significant friction points for GHES customers. Starting in 3.21, the pre-upgrade steps run while the appliance is still live, moving ~20 minutes of work outside the maintenance window and reducing total downtime accordingly.

Guía de contribución

Abrir la guía de contribución

Línea de trabajo

No files, tests, or entry points are identified in the roadmap issue. Start by clarifying the GHES 3.21 upgrade workflow and implementation scope; done should mean the pre-upgrade work runs while the appliance serves traffic and reduces maintenance-window downtime by about 20 minutes.

Escrito por el modelo de indexación a partir del texto del issue.

Evaluación

Stack tecnológico
github
Área
infrastructure, release
Tipo de issue
Nueva funcionalidad
Dificultad
5/5
Tiempo estimado
Más de una semana
Estado de actividad
Tranquilo
Claridad
Necesita aclaración
Aptitud para principiantes
25/100

Recibe los nuevos issues en tu correo

Un resumen breve de issues de GitHub para principiantes.