Add merge queue CI optimisation
- 主要言語
- Go
- スター
- 1.5k
- フォーク
- 70
- 平均マージ
- 1日 8時間
- マージ済み PR(30日)
- 7
説明
## The problem
We use stacks a lot, and often mid stack PRs have some CI failures that are fixed above.
When I merge a stack of 5 PRs, I don't need to run CI in each of them, it's OK to skip 1-4 and only run CI in 5th. It saves A LOT of wasted runner minutes.
## Current state
You have this checkbox "Only merge non-failing pull requests":
**Imagine we have added 5 stacked PRs to a merge queue, with CI like this**
PR 1 pass ✅
PR 2 pass ✅
PR 3 fail ❌
PR 4 pass ✅
PR 5 fail ❌
Checkbox set:
It will run CI on 5 pull requests, **merge 1-2**
Checkbox not set:
It will run CI on 5 pull requests, **merge 1-4**
## Proposal
It is greedy to _merge something_ now. I want it to _merge a queued atomic stack_ instead.
In order to make it work, you need another checkbox "merge a queued stack atomically and only run CI on the last PR", where it will only run CI on PR 5, and it **will not merge** 1-2 or 1-4 of I queued 1-5.
However, if I only added 1-2 or 1-4 to the merge queue - it will merge, because the last **queued** PR succeeded.
**For context:** it is not rare for us to hit a 50 PRs limit in a graphite, and 20 PRs stacks are very usual. Saving 20x runner minutes is a huge deal.
コントリビューションガイド
調査の方向性
No files or tests are named. Start by locating the merge-queue implementation and the existing “Only merge non-failing pull requests” option, then trace how stacked PRs are evaluated. Done means a queued stack can run CI only on its last PR and merge atomically, while a partial queue still merges when its last queued PR succeeds.
索引モデルが issue の本文から書いたものです。
評価
- 技術スタック
- github, go
- 領域
- cli, devtools
- issue の種類
- 機能追加
- 難易度
- 5/5
- 見積もり時間
- 1週間以上
- 活発さ
- 活発
- 明瞭さ
- おおむね明確
- 初心者へのやさしさ
- 38/100