github / github/copilot-cli

"Remaining req." should reflect budget usage after pre-allocated Copilot Pro+ credits are exhausted

Đang mở
#2,761 0 bình luận 0 reaction 0 người được giao Xem trên GitHub
area:models
Ngôn ngữ chính
Shell
Star
11.2k
Fork
1.9k
Merge trung bình
14 giờ 16 phút
Pull request đã merge (30 ngày)
6

Mô tả

### Describe the bug

The `Remaining req.` indicator in Copilot CLI correctly tracks usage while consuming pre-allocated Copilot Pro+ credits. However, once those allocated credits are exhausted, the experience breaks down in two ways:

1. **Errors instead of a clear message** — Instead of a friendly notification with actionable guidance, the CLI surfaces raw service errors that are confusing and unhelpful.

2. **No budget visibility** — If the user has additional spending budgets configured (beyond the pre-allocated credits), the `Remaining req.` indicator does not transition to showing budget consumption. It effectively goes dark or becomes meaningless after allocated credits run out.

### Expected behavior

**When pre-allocated credits are exhausted:**

- Seamlessly transition the `Remaining req.` indicator to show budget usage, e.g.: `Pro+ Budget (72% remaining)`
- If no budget is configured, show: `Pre-allocated credits used. Set up a spending budget to continue: [link]`
- Do **not** surface raw backend errors to the user

**When running on a configured budget:**

- The indicator should show percentage remaining: `[budget name] (XX% remaining)`
- The backend presumably already reports this data (similar to how it reports pre-allocated usage), so the CLI just needs to consume and display it

**Budget clarity:**

- When suggesting the user `increase budget,` specify *which* budget (there may be multiple) and link to the relevant settings page

### Additional context

This likely requires deeper integration with the backend Copilot service's billing/quota APIs. The pre-allocated credits flow already works well — the ask is to extend that same level of visibility and grace into the post-allocation / budget-based usage phase.

The transition from `free included credits` to `paid budget` is a critical UX moment. Users need confidence about what they're spending and clear control, not cryptic errors.

Hướng dẫn đóng góp

Mở hướng dẫn đóng góp

Đánh giá

Issue này chưa được đánh giá.

Nhận issue mới trong hộp thư của bạn

Bản tóm tắt ngắn những issue GitHub phù hợp với người mới.