EnergySystemsModellingLab / EnergySystemsModellingLab/MUSE_OS

Existing capacity not registered if zero capacity in the starting year

Đang mở
#508 0 bình luận 1 reaction 0 người được giao Xem trên GitHub
bug
Ngôn ngữ chính
Python
Star
29
Fork
12
Chỉ số merge pull request
Không có pull request nào được merge trong 30 ngày

Mô tả

The modeler may want to specify capacity addition in a future year (e.g. if they know a power plant is going to be built in the future). This can be done through the `ExistingCapacity.csv` file, however anything put in this file will only be registered if there is nonzero capacity in the starting year. If this isn't the case, the asset won't be registered and any additional capacity put in future years won't be applied.

I think maybe a current workaround is to put a small capacity in the starting year (e.g. 0.1), (although I'm not sure whether that actually works), but it would be good to get this working without having to do that

Hướng dẫn đóng góp

Chưa lập chỉ mục được hướng dẫn đóng góp cho kho mã nguồn này

Hướng nghiên cứu

Bắt đầu bằng cách theo dõi cách ExistingCapacity.csv được đọc và cách các tài sản được đăng ký khi công suất trong năm bắt đầu bằng không. Tái hiện trường hợp chỉ có công suất trong tương lai, sau đó xác minh rằng tài sản được đăng ký và phần bổ sung trong tương lai được áp dụng mà không thêm công suất tạm thời vào năm bắt đầu.

Do mô hình lập chỉ mục viết ra từ nội dung của issue.

Đánh giá

Công nghệ
python
Lĩnh vực
backend
Loại issue
Lỗi
Độ khó
3/5
Thời gian dự kiến
1-2 ngày
Mức độ hoạt động
Đình trệ
Độ rõ ràng
Khá rõ ràng
Mức phù hợp với người mới
45/100

Nhận issue mới trong hộp thư của bạn

Bản tóm tắt ngắn những issue GitHub phù hợp với người mới.