Mô tả
The modeler may want to specify capacity addition in a future year (e.g. if they know a power plant is going to be built in the future). This can be done through the `ExistingCapacity.csv` file, however anything put in this file will only be registered if there is nonzero capacity in the starting year. If this isn't the case, the asset won't be registered and any additional capacity put in future years won't be applied.
I think maybe a current workaround is to put a small capacity in the starting year (e.g. 0.1), (although I'm not sure whether that actually works), but it would be good to get this working without having to do that
Hướng dẫn đóng góp
Chưa lập chỉ mục được hướng dẫn đóng góp cho kho mã nguồn này
Hướng nghiên cứu
Bắt đầu bằng cách theo dõi cách ExistingCapacity.csv được đọc và cách các tài sản được đăng ký khi công suất trong năm bắt đầu bằng không. Tái hiện trường hợp chỉ có công suất trong tương lai, sau đó xác minh rằng tài sản được đăng ký và phần bổ sung trong tương lai được áp dụng mà không thêm công suất tạm thời vào năm bắt đầu.
Do mô hình lập chỉ mục viết ra từ nội dung của issue.
Đánh giá
- Công nghệ
- python
- Lĩnh vực
- backend
- Loại issue
- Lỗi
- Độ khó
- 3/5
- Thời gian dự kiến
- 1-2 ngày
- Mức độ hoạt động
- Đình trệ
- Độ rõ ràng
- Khá rõ ràng
- Mức phù hợp với người mới
- 45/100