plotly / plotly/plotly.R

ggplotly dynamic ticks does not work with empty traces

Abierto
#1,713 0 comentarios 0 reacciones 0 asignados Ver en GitHub

Nadie ha tomado este issue todavía.

Lenguaje dominante
R
Estrellas
2.7k
Forks
641
Métricas de merge de PR
Sin PR fusionados en 30 d

Descripción

When using dynamicTicks for ggplotly in combination with dates, traces with empty data result in an error:

Error in as.POSIXct.default(x, origin = "1970-01-01", tz = scale$timezone) : 
  do not know how to convert 'x' to class "POSIXct"

This is because the invert_date function in gg2list() gets passed a NULL value (since no data exists for that specific layer).

p <- ggplot(mapping=aes(x=TIME, y=VAL)) +
  geom_point(data=data.frame(TIME=as.POSIXct(character()), VAL=numeric())) +
  geom_line(data=data.frame(TIME=c(Sys.time(), Sys.time()+lubridate::hours(2)), VAL=runif(2)))
plotly::ggplotly(p)
plotly::ggplotly(p, dynamicTicks=TRUE)

Guía de contribución

Abrir la guía de contribución

Primeros pasos

  1. Lee el issue completo y luego la guía de contribución del proyecto.
  2. Comenta en el issue que vas a ocuparte — evita que dos personas hagan lo mismo.
  3. Haz un fork del repositorio y trabaja en una rama.
  4. Abre un pull request que haga referencia al número del issue.

Línea de trabajo

Comienza en gg2list(), centrándote en la función invert_date mencionada en el informe. Reproduce el ejemplo de ggplotly proporcionado con un trace de fecha vacío y dynamicTicks=TRUE, y verifica después que la conversión ya no produzca errores cuando una capa no tenga datos.

Escrito por el modelo de indexación a partir del texto del issue.

Evaluación

Stack tecnológico
r
Área
data-visualization
Tipo de issue
Error
Dificultad
3/5
Tiempo estimado
1-2 días
Estado de actividad
Estancado
Claridad
Bastante claro
Aptitud para principiantes
48/100

Recibe los nuevos issues en tu correo

Un resumen breve de issues de GitHub para principiantes.