hyperlight-dev / hyperlight-dev/hyperlight
Improve testing architecture
Ouverte
area/infrastructure
area/testing
lifecycle/confirmed
- Langage dominant
- Rust
- Étoiles
- 4.7k
- Forks
- 208
- Merge moyen
- 1 j 7 h
- PR mergées (30 j)
- 47
Description
We have reached a point where we have a pretty large matrix of tests and PR tests might take too long (even more w/ adding different skews for Intel/AMD). We should consider improving the tests (running unit tests only on Linux/Windows), and maybe adding merge queues back again.
In addition, we should think about which combination of cargo features we want to test compile and/or test the entire test suite with, and when we want to run these.
Guide de contribution
Ouvrir le guide de contribution
Évaluation
Cette issue n'a pas encore été évaluée.