[FEAT] Allow to switch Model / Effort before transitioning between Plan > Implementation
- Langage dominant
- Aucune donnée de langage
- Étoiles
- 2.1k
- Forks
- 153
- Métriques de merge des PR
- Aucune PR mergée en 30 j
Description
When switching from Plan > Implementation, there is no way to change the effort before we kick the implementation off, other than stopping the execution, change the effort and type "continue"
Would be great to be able to change the main model / effort running the session when transitioning from planning.
I usually use frontier capabilities to plan, then more balanced options to orchestrate the Implementation
---
| Field | Value |
| --- | --- |
| App version | 1.1.5 |
| OS | macOS 26.5.2 |
| Theme | GitHub |
| Path | /chat |
| Tenure | Week 13 |
Guide de contribution
Ouvrir le guide de contribution
Piste de recherche
Start at the /chat Plan > Implementation transition and trace how the current session model and effort are selected. Done means the user can change both before implementation begins, without stopping the execution; verify the transition preserves those selections.
Rédigé par le modèle d'indexation à partir du texte de l'issue.
Évaluation
- Domaine
- desktop
- Type d'issue
- Fonctionnalité
- Difficulté
- 3/5
- Temps estimé
- 1-2 jours
- Activité
- Calme
- Clarté
- Plutôt claire
- Accessibilité débutants
- 55/100