Speed up integration testing on the CI (taking around ~21 right now 09/23)
- Langage dominant
- Dart
- Étoiles
- 1.7k
- Forks
- 404
- Merge moyen
- 6 j 17 h
- PR mergées (30 j)
- 18
Description
example run that took 47 min: https://github.com/flutter/devtools/actions/runs/5336567626/jobs/9671473410?pr=5919
We should see if there is anything we can do to shard these or share steps that we are already doing for other jobs (e.g. code generation). Perhaps we could run the test in 3-4 different shards and make each shard its own job that can run concurrently. We may also consider sharing the step to start chrome driver and shut it down, as right now this is happening for each test, not once for running all tests. This is not that expensive though looking at the timing logs, but it could be a small win.
Guide de contribution
Ouvrir le guide de contribution
Évaluation
Cette issue n'a pas encore été évaluée.