[Release][Java] Verify staged maven artifacts
- Linguagem predominante
- Java
- Estrelas
- 94
- Forks
- 152
- Merge médio
- 3d 16h
- PRs com merge (30d)
- 11
Descrição
We have two tests right now:
1. Execute `mvn test` from the source tarball's java directory testing the source https://github.com/apache/arrow/blob/master/dev/release/verify-release-candidate.sh#L278
2. Verify the checksums and signatures of the uploaded maven artifacts https://github.com/apache/arrow/blob/master/dev/release/verify-release-candidate.sh#L766
But we don't actually **test** the packages. We should add that to the verification scripts, since 7.0 is going to be the first release shipping the jars with bundled JNI libraries.
cc @kou @anthonylouisbsb
**Reporter**: [Krisztian Szucs](https://issues.apache.org/jira/browse/ARROW-15486) / @kszucs
#### Related issues:
- [[Release][Java] Add missing files to list of artifacts to deploy](https://github.com/apache/arrow/issues/31193) (relates to)
#### Original Issue Attachments:
- [image-2022-02-18-07-07-45-928.png](https://issues.apache.org/jira/secure/attachment/13040235/image-2022-02-18-07-07-45-928.png)
#### PRs and other links:
- [GitHub Pull Request apache/arrow#148](https://github.com/apache/arrow-cookbook/pull/148)
**Note**: *This issue was originally created as [ARROW-15486](https://issues.apache.org/jira/browse/ARROW-15486). Please see the [migration documentation](https://github.com/apache/arrow/issues/14542) for further details.*
Guia de contribuição
Direção de pesquisa
Comece por dev/release/verify-release-candidate.sh, especialmente pelo teste Java existente para o source-tarball e pelas etapas de verificação dos artefatos Maven. Revise como `mvn test` é executado a partir do diretório Java do source-tarball e como os checksums e as assinaturas são verificados. Está concluído quando os scripts de verificação também testarem os pacotes Maven, incluindo jars com bibliotecas JNI integradas.
Escrita pelo modelo de indexação a partir do texto da issue.
Avaliação
- Stack de tecnologia
- java
- Domínio
- release, testing
- Tipo de issue
- Funcionalidade
- Dificuldade
- 4/5
- Tempo estimado
- 3-5 dias
- Status de atividade
- Estagnada
- Clareza
- Razoavelmente clara
- Facilidade para iniciantes
- 35/100