[Java] Implement "ArrowBufReadChannel" abstraction and alternate MessageSerializer that uses this
- Vorherrschende Sprache
- Java
- Sterne
- 94
- Forks
- 152
- Ø Merge
- 3 T. 16 Std.
- Gemergte PRs (30 T.)
- 11
Beschreibung
The current MessageSerializer implementation is wasteful when used to read an IPC payload that is already in-memory in an `ArrowBuf`. In particular, reads out of a `ReadChannel` require memory allocation
- https://github.com/apache/arrow/blob/master/java/vector/src/main/java/org/apache/arrow/vector/ipc/message/MessageSerializer.java#L569
- https://github.com/apache/arrow/blob/master/java/vector/src/main/java/org/apache/arrow/vector/ipc/message/MessageSerializer.java#L290
In C++, we have abstracted memory allocation out of the IPC read path so that zero-copy is possible. I suggest that a similar mechanism can be developed for Java to improve deserialization performance for in-memory messages. The new interface would return `ArrowBuf` when performing reads, which could be zero-copy when possible, but when not the current strategy of allocate-copy could be used
**Reporter**: [Wes McKinney](https://issues.apache.org/jira/browse/ARROW-3192) / @wesm
**Note**: *This issue was originally created as [ARROW-3192](https://issues.apache.org/jira/browse/ARROW-3192). Please see the [migration documentation](https://github.com/apache/arrow/issues/14542) for further details.*
Beitragsleitfaden
Rechercherichtung
Lesen Sie java/vector/src/main/java/org/apache/arrow/vector/ipc/message/MessageSerializer.java an den referenzierten Zeilen 569 und 290, um den aktuellen ReadChannel-Zuweisungspfad zu verstehen. Untersuchen Sie die vorgeschlagene ArrowBufReadChannel-Abstraktion und den alternativen MessageSerializer, wobei zero-copy-Lesevorgänge für im Speicher befindliche ArrowBuf-Payloads und ein Fallback mit Zuweisung und Kopieren die Abschlusskriterien sind.
Vom Indexierungsmodell aus dem Issue-Text verfasst.
Bewertung
- Tech-Stack
- java
- Bereich
- data-engineering
- Issue-Typ
- Feature
- Schwierigkeit
- 5/5
- Geschätzter Aufwand
- Über eine Woche
- Aktivitätsstatus
- Veraltet
- Klarheit
- Größtenteils klar
- Anfängerfreundlichkeit
- 35/100