Descrição
# Why?
**As a** maintainer of rms-app's backend
**I want** to finish moving off Amplify Gen 1 (CLI-driven `amplify/backend/*` CloudFormation) onto Amplify Gen 2 (code-first `ampx`/CDK)
**So that** the backend is on a supported, code-first infra toolchain, and the paused schema epic (#244 and its subtasks) plus the new-frontend work can resume on solid ground.
# What?
Full context and phased plan: `.claude/plans/can-you-make-a-shimmying-crane.md`.
This isn't a straightforward migration — it's mostly a rebuild, because this project uses raw CloudFormation DynamoDB tables and a custom shared-source TypeScript build pipeline (`backend-build.js`) rather than Amplify's higher-level GraphQL "Data" or default `defineFunction` bundling. Storage (7 tables) and compute (10 Lambdas) have no automated migration path and must be hand-rebuilt as CDK code inside Gen 2's `defineBackend`.
Key facts baked into the plan:
- The Gen 1 Cognito User Pool was already deleted from `alpha` (no users to preserve) — auth is a fresh `defineAuth` pool, not a reference.
- `smsrouter`'s old SNS/Pinpoint phone number is lost — it deploys as a plain Lambda with no trigger; rebuilding SMS routing is separate future work, out of scope here.
- 6 of 7 DynamoDB tables share an identical shape (partition key `id`, streams enabled); `transactions` is the outlier (partition key `number`, no streams).
- Zero-data-loss table cutover for the live `alpha` environment relies on `cdk import` (brings existing tables under the new stack without delete/recreate).
## Status (as of 2026-07-30)
- **Phase 0 — Prep**: DONE. `amplify-gen2/` scaffolded, Gen 2 deps added.
- **Phase 1 — Auth (`defineAuth`)**: DONE. `amplify-gen2/auth/resource.ts` exists.
- **Phase 2 — Storage tables**: DONE. `amplify-gen2/storage/tables.ts` defines all 7 tables.
- **Phase 3 — AddItem POC**: DONE. `amplify-gen2/functions/add-item/resource.ts` exists and is wired into `backend.ts`.
- **Phase 4 — Remaining 9 Lambdas**: NOT STARTED. Only compiled `build/` output exists for `borrow-from-schedule`, `borrow-item`, `create-batch`, `create-reservation`, `delete-batch`, `delete-item`, `return-item`, `smsrouter`, `update-tags` — no `resource.ts` for any of them, and none are wired into `defineBackend` in `backend.ts`. Tracked as a sub-issue below.
- **Phase 5 — `alpha` cutover**: NOT STARTED. Tracked as a sub-issue below.
- **Phase 6 — Decommission Gen 1**: NOT STARTED. Tracked as a sub-issue below.
## Paused work, to resume after Phase 6
The backend schema epic (#244 and subtasks #245/#247/#248, plus #258/#52/#51/#213) and the new-frontend plan are paused pending this rebuild, since this migration deliberately keeps `ts-code/src` (business logic) untouched while the surrounding infra changes shape entirely. Resume that work on the rebuilt Gen 2 codebase once Phase 6 completes.
# Additional context
Sub-issues below cover the remaining phases. See the plan doc for full detail on CI/CD adaptation (`backend-ci.yml`/`backend-cd.yml`/`backend-canary.yml`) and test suite adaptation (`Amplify.test.ts` config source + auth rewrite), both folded into the Phase 5/6 sub-issues.
Guia de contribuição
Nenhum guia de contribuição indexado para este repositório
Direção de pesquisa
O plano está em `.claude/plans/can-you-make-a-shimmying-crane.md`. O trabalho envolve reconstruir 9 Lambdas em `amplify-gen2/functions/` com arquivos `resource.ts` e conectá-las em `amplify-gen2/backend.ts`. Isso exige conhecimento profundo de AWS CDK, Amplify Gen 2 e das funções Lambda existentes em `ts-code/src`. “Concluído” significa que todas as funções estão definidas no Gen 2 e que o ambiente `alpha` foi migrado usando `cdk import`.
Escrita pelo modelo de indexação a partir do texto da issue.
Avaliação
- Stack de tecnologia
- aws, typescript
- Domínio
- backend, cloud, devops, infrastructure
- Tipo de issue
- Refatoração
- Dificuldade
- 5/5
- Tempo estimado
- Mais de uma semana
- Status de atividade
- Pouca atividade
- Clareza
- Claramente especificada
- Facilidade para iniciantes
- 20/100