Update SG6000-CN documentation to include steps for power supplies
@netapp-madkat is already working on this.
Since Apr 28, 2023.
Assessment
This issue has not been assessed yet.
Description
Page: Replace SG6000-CN controller
The Net2 team received the following feedback from the field:
4. Remove and replace the SG6000-CN controller:
a. Label the cables and then disconnect the cables and any SFP+ or SFP28 transceivers.
To prevent degraded performance, do not twist, fold, pinch, or step on the cables.
b. Remove the failed controller from the cabinet or rack.
<-----need to transfer power supplies but doesn't mention in the procedure
c. Install the replacement controller into the cabinet or rack.
d. Replace the cables and any SFP+ or SFP28 transceivers.
e. Power on the controller and monitor the controller LEDs and boot-up codes.
- Dominant language
- No language data
- Stars
- 5
- Forks
- 8
- PR merge metrics
- No merged PRs in 30d
Contributor guide
No contributing guide indexed for this repository
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
More from NetAppDocs/storagegrid-116
-
documentation
NetAppDocs/storagegrid-116#83 · 1 comment · 1 assignee ·
-
NetAppDocs/storagegrid-116#80 · 2 comments · 1 reaction · 1 assignee ·
-
No mention in the 11.6 upgrade docs of being able to being to perform combined upgrade and hotfix. Opendocumentation
NetAppDocs/storagegrid-116#79 · 1 comment · 1 assignee ·
-
documentation
NetAppDocs/storagegrid-116#70 · 2 comments · 1 assignee ·
-
documentation
NetAppDocs/storagegrid-116#49 · 5 comments · 1 assignee ·