ISISComputingGroup / ISISComputingGroup/IBEX
Squish Tests: Experiment setup period types
- Lingua principale
- Nessun dato sulla lingua
- Stelle
- 6
- Fork
- 2
- Merge medio
- 16h 40m
- PR unite (30g)
- 2
Descrizione
As a developer I would like to verify the following behaviour using Squish:
- In the `DAE` perspective, in the `Experiment Setup` tab, change the period type.
- Verify that the settings for each type are as expected.
- Software: PC controlled - single setting `Number of software periods`.
- Hardware: DAE internal control - `Hardware periods sequences`, `Output delay`, `Source`.
- Hardware: External signal control - Same as DEA but with `Hardware periods sequences` and frames disabled.
- For `Select Period Source`:
- Verify that `Specify Parameters` shows a table of parameters.
- Verify that `Read from file` shows a file selection drop down menu.
Guida per i contributori
Nessuna guida per i contributori indicizzata per questo repository
Direzione di ricerca
Iniziare individuando i test Squish esistenti per la prospettiva DAE e la scheda „Experiment Setup“. Eseguire i test con i tipi di periodo e le opzioni di „Select Period Source“ elencati, quindi verificare che i controlli visualizzati corrispondano alle impostazioni previste e che i controlli abbiano esito positivo.
Scritto dal modello di indicizzazione a partire dal testo della issue.
Valutazione
- Ambito
- testing
- Tipo di issue
- Funzionalità
- Difficoltà
- 3/5
- Tempo stimato
- 1-2 giorni
- Stato di attività
- Ferma
- Chiarezza
- Abbastanza chiara
- Idoneità per principianti
- 45/100