As a developer I would like to verify the following behaviour using Squish:

- In the `DAE` perspective, in the `Experiment Setup` tab, change the period type.
- Verify that the settings for each type are as expected.
- Software: PC controlled - single setting `Number of software periods`.
- Hardware: DAE internal control - `Hardware periods sequences`, `Output delay`, `Source`.
- Hardware: External signal control - Same as DEA but with `Hardware periods sequences` and frames disabled.
- For `Select Period Source`:
- Verify that `Specify Parameters` shows a table of parameters.
- Verify that `Read from file` shows a file selection drop down menu.

Guida per i contributori

Nessuna guida per i contributori indicizzata per questo repository

Direzione di ricerca

Iniziare individuando i test Squish esistenti per la prospettiva DAE e la scheda „Experiment Setup“. Eseguire i test con i tipi di periodo e le opzioni di „Select Period Source“ elencati, quindi verificare che i controlli visualizzati corrispondano alle impostazioni previste e che i controlli abbiano esito positivo.

Scritto dal modello di indicizzazione a partire dal testo della issue.

Valutazione

Ambito
testing
Tipo di issue
Funzionalità
Difficoltà
3/5
Tempo stimato
1-2 giorni
Stato di attività
Ferma
Chiarezza
Abbastanza chiara
Idoneità per principianti
45/100

Ricevi le nuove issue nella tua casella

Un breve riepilogo di issue GitHub adatte ai principianti.