ISISComputingGroup / ISISComputingGroup/IBEX
Squish Tests: Experiment setup period types
- Dominant language
- No language data
- Stars
- 6
- Forks
- 2
- Avg merge
- 16h 40m
- Merged PRs (30d)
- 2
Description
As a developer I would like to verify the following behaviour using Squish:
- In the `DAE` perspective, in the `Experiment Setup` tab, change the period type.
- Verify that the settings for each type are as expected.
- Software: PC controlled - single setting `Number of software periods`.
- Hardware: DAE internal control - `Hardware periods sequences`, `Output delay`, `Source`.
- Hardware: External signal control - Same as DEA but with `Hardware periods sequences` and frames disabled.
- For `Select Period Source`:
- Verify that `Specify Parameters` shows a table of parameters.
- Verify that `Read from file` shows a file selection drop down menu.
Contributor guide
No contributing guide indexed for this repository
Assessment
This issue has not been assessed yet.