ISISComputingGroup / ISISComputingGroup/IBEX
Muon Kicker: Display Status of Kicker PSU
- Lingua principale
- Nessun dato sulla lingua
- Stelle
- 6
- Fork
- 2
- Merge medio
- 16h 40m
- PR unite (30g)
- 2
Descrizione
As a muon scientist, I need to see the current status of the Kicker PSU, so that I can monitor its behaviour.
#### Acceptance Criteria
1. I can view whether the Kicker PSU is currently switched ON or OFF
1. I can view the voltage readback of the Kicker PSU (measured in kV).
1. I can view the current readback of the Kicker PSU (measured in mA).
#### Notes
1. required by #3071
1. The Kicker PSU is controlled by a National Instruments DAQ device (DAQ-Mx).
1. See [Kicker_Separator_Schematics](http://www.facilities.rl.ac.uk/isis/computing/ICPdiscussions/Muon%20FE/MuonFE_Kicker_Separator%20v4.pptx).
1. The ON/OFF status of the Kicker PSU is read from a PLC.
1. The PLC is a Schneider Electric M580 device
1. The Kicker PSU voltage & current can only be read from the DAQ-Mx. At the present time, they cannot be set (hardware limitation).
1. **Note:** IBEX does not communicate directly with the Kicker PSU. It communicates with the NI DAQ-Mx. In order to read or set the voltage and/or current on the PSU, there needs to be some sort of calibration or lookup between the NI DAQ-Mx and the PSU.
* The calibration (scaling) relationship is:
* Kicker Voltage: 0-10V (DAQ) = 0-45kV (PSU)
* Kicker Current: 0-10V (DAQ) = 0-15mA (PSU)
Guida per i contributori
Nessuna guida per i contributori indicizzata per questo repository
Direzione di ricerca
Inizia individuando l’integrazione IBEX per il National Instruments DAQ-Mx e il Schneider Electric M580 PLC. Verifica come il PLC fornisce lo stato ON/OFF e come le letture di DAQ-Mx vengono mappate sui valori PSU utilizzando la scala 0–10 V indicata. Il lavoro è completato quando sono visibili lo stato della Kicker PSU, la tensione in kV e la corrente in mA.
Scritto dal modello di indicizzazione a partire dal testo della issue.
Valutazione
- Ambito
- embedded-iot
- Tipo di issue
- Funzionalità
- Difficoltà
- 4/5
- Tempo stimato
- 3-5 giorni
- Stato di attività
- Ferma
- Chiarezza
- Abbastanza chiara
- Idoneità per principianti
- 35/100