AletheiaFact / AletheiaFact/aletheia
PROC-2 · Stalled backlog (umbrella: 2a + 2b)
- Langage dominant
- TypeScript
- Étoiles
- 55
- Forks
- 20
- Merge moyen
- 2 j 6 h
- PR mergées (30 j)
- 2
Description
> **Umbrella** · split into two child issues (see task list). Kept open as a tracking umbrella (not closed, so sub-issue progress stays visible). Item derived from the fact-checking cycle analysis (**2026-07-03, v2**).
### Finding (evidence)
The ~215 open tasks are **not one block** — they split by idle time and content into two distinct governance problems, acted on separately below.
### Split
- [ ] #2509 — PROC-2a · Purge/diagnose the **~60–75 abandoned** tasks (empty `reviewData`, ~590–660 d idle) — 🔴
- [ ] #2510 — PROC-2b · Triage/SLA the **~142–155 stuck-active** tasks (~226–235 d idle; `main`-only ~108→~70 d) — 🔴
### Notes
- Both depend on INST-4 (#2494) for the `abandoned`/`archived` state.
- The technical "how" for 2b is TECH-4 (SLA + auto-owner).
---
- **Epic:** #2490
Guide de contribution
Aucun guide de contribution indexé pour ce dépôt
Piste de recherche
This is a tracking umbrella, not a direct implementation issue. Start by reading the child issues #2509 and #2510, plus dependency #2494 and the referenced TECH-4 item, to understand where the actual work lives. Done for this issue means the child work is completed or the umbrella checklist is updated, not a standalone patch here.
Rédigé par le modèle d'indexation à partir du texte de l'issue.
Évaluation
- Stack technique
- typescript
- Domaine
- developer-experience, tooling
- Type d'issue
- Fonctionnalité
- Difficulté
- 5/5
- Temps estimé
- Plus d'une semaine
- Activité
- À l'abandon
- Clarté
- À clarifier
- Accessibilité débutants
- 18/100