AbsaOSS / AbsaOSS/enceladus

Getting 'Atum already initialized' error when trying to run Std+Conf multiple times

Đang mở
#2,213 1 bình luận 0 reaction 0 người được giao Xem trên GitHub
bug priority: undecided
Ngôn ngữ chính
Scala
Star
33
Fork
16
Chỉ số merge pull request
Không có pull request nào được merge trong 30 ngày

Mô tả

## Describe the bug
The error occurs when Standardization+Conformance jobs from a single Spark session. This happenned when running from Pramen since Pramen runs multiple Standardization+Conformance jobs in a single Spark Session.

## To Reproduce
Steps to reproduce the behavior OR commands run:
1. Configure Pramen to run EnceladusSink for multiple tables in a pipeline.
2. Run the pipeline.
4. The error will occur saying "Control Measurements Tracking already initialized"

## Expected behavior
Allow running multiple Standardization+Conformance jobs multiple times from teh same Spask session.

## Screenshots
N/A

## Desktop (please complete the following information):
This was happening both in UAT and in PROD.

## Additional context
There is already logic in Enceladus that explicitly disables control metrics when conformance jobs runs after standardization. So single Standardization, Conformance, and Standardization+Conformance jobs run fine. The issue happens only if both Standardization and Conformance run multiple times.

Hướng dẫn đóng góp

Mở hướng dẫn đóng góp

Đánh giá

Issue này chưa được đánh giá.

Nhận issue mới trong hộp thư của bạn

Bản tóm tắt ngắn những issue GitHub phù hợp với người mới.