Decide the approach for post-deployment smoke testing on UAT/PROD
- 主要語言
- Python
- 星號
- 4
- 分支
- 0
- 平均合併
- 1 天 5 小時
- 30 天內合併 PR
- 8
描述
### Background
database/migrations/V1.4.0.2__initial_schema.ddl includes a public_cps_za_test table used to write/read a "test topic" event, originally added by @oto-macenauer-absa as a PoC mechanism for basic post-deployment smoke testing (write to a test topic, read via SQS, confirm the pipeline works end-to-end). New question was raised whether this is still needed now that a DEV environment exists for testing, and flagged that it means a test-only object lives permanently inside the real UAT/PROD schema. @miroslavpojer raised that running any automated smoke test — read or write — against PROD carries real risk, especially write-based tests, which could be silently forgotten and cause harm over time.
### Questions To Answer
1. Do we still need an automated post-deployment smoke test against UAT/PROD, given DEV exists for general testing?
2. If yes, should it be read-only, write-based, or both?
3. Should smoke-test objects (tables/topics) be kept separate from the real production schema/queues instead of embedded alongside real data (current solution)?
4. Should public_cps_za_test be removed, kept as-is, or replaced with a differently scoped mechanism?
### Additional Resources
• Discussion thread https://github.com/AbsaOSS/EventGate/pull/214#discussion_r3813778453.
• Related: #201 (Flyway migrations setup)
貢獻指南
這個儲存庫沒有索引到貢獻指南
評估
這個 Issue 還沒有評估資料。