ADORSYS-GIS / ADORSYS-GIS/lightbridge-governance
[Story]: Gap analysis against ISO/IEC 42001 clauses 4-10
- Lingua principale
- Rust
- Stelle
- 1
- Fork
- 2
- Merge medio
- 14h 36m
- PR unite (30g)
- 107
Descrizione
## Summary
Perform a gap analysis of lightbridge's current AI governance practices against ISO/IEC 42001 clauses 4-10.
## Intent / Source of truth
This is the prerequisite scoping work before building the AI management system documentation. Part of [Epic] ISO/IEC 42001 certification path.
## Scope
- [ ] Clause-by-clause review (4 context, 5 leadership, 6 planning, 7 support, 8 operation, 9 performance evaluation, 10 improvement)
- [ ] Gap list per clause with owner and target remediation
## Out of scope
- Remediating the gaps themselves (tracked as g2s2/g2s3 and follow-on work)
## Verification
A reviewed gap-analysis document covering all seven clauses, with no clause left unassessed.
## Risk assessment
Low risk in isolation; the risk is downstream if this analysis is superficial and misses a load-bearing gap that surfaces during certification audit.
## AI Usage Declaration
Drafted with AI assistance during the 2026-08-13 cross-repo backlog consolidation and enterprise-readiness research. A human owns intent, verification and consequences.
Guida per i contributori
Apri la guida per i contributori
Direzione di ricerca
No repository file, test, or entry point is named. Review the current AI governance practices against ISO/IEC 42001 clauses 4-10, recording each gap with an owner and target remediation; done means a reviewed gap-analysis document covers all seven clauses with none left unassessed.
Scritto dal modello di indicizzazione a partire dal testo della issue.
Valutazione
- Ambito
- ai, documentation
- Tipo di issue
- Documentazione
- Difficoltà
- 4/5
- Tempo stimato
- 3-5 giorni
- Stato di attività
- Tranquilla
- Chiarezza
- Abbastanza chiara
- Idoneità per principianti
- 45/100