Originally by sele


Dear,

If you open a calendar with date range 30sept to 3 nov and you add an all day event on 7oct.
The drag and drop fails if you try to move this item to week 44.
When moving this item the calendar does not indicates where the item is going to be dragged.
When you drop this item, the event returns this item whit the start date of the day before.

We got the same problem when moving from week 44 to 41, 42 and 43 only on October(2013, 2014, ..)

Kind regards,

Ewout


Imported from https://dev.vaadin.com/ issue #12791

Contributor guide

Open the contributing guide

First steps

  1. Read the whole issue, then the project's contributing guide.
  2. Comment on the issue to say you are picking it up — it saves two people doing the same work.
  3. Fork the repository and make your change on a branch.
  4. Open a pull request that references the issue number.

Research direction

No source file, test, or entry point is named. Reproduce the drag-and-drop failure on the month view with the reported September–November date range, especially October week transitions, then trace the calendar drag-and-drop handling. Done means the event shows its destination while dragging and retains the correct start date after dropping.

Written by the indexing model from the issue text.

Assessment

Tech stack
java
Domain
frontend
Issue type
Bug
Difficulty
4/5
Estimated time
3-5 days
Activity status
Stale
Clarity
Needs clarification
Newbie friendliness
30/100