uselagoon / uselagoon/remote-controller
build priority cancellations
Nobody has claimed this yet.
- Dominant language
- Go
- Stars
- 5
- Forks
- 2
- Avg merge
- 1d 1h
- Merged PRs (30d)
- 5
Description
build cancellation should take into consideration build priorities
if a high priority build is pending, and a lower priority build is triggerd, the controller should not cancel the higher priority build
Contributor guide
No contributing guide indexed for this repository
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
Start by locating the controller logic that cancels builds and trace how build priority is represented and compared. Confirm the behavior for a pending high-priority build followed by a lower-priority trigger; done means the higher-priority build is preserved while lower-priority cancellation still works as intended.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- go, kubernetes
- Domain
- build-system, devops, infrastructure
- Issue type
- Feature
- Difficulty
- 4/5
- Estimated time
- 3-5 days
- Activity status
- Stale
- Clarity
- Mostly clear
- Newbie friendliness
- 35/100