ucdavis / ucdavis/ipa-client-angular
Mass imported activities sometimes fail to show in the Scheduling view activity list, but do appear on the calendar
Open
Nobody has claimed this yet.
bug
- Dominant language
- JavaScript
- Stars
- 2
- Forks
- 3
- PR merge metrics
- No merged PRs in 30d
Description
See production data for the Electrical and Computer Engineering group, EEC 001 - 001 for Fall 2017.

Contributor guide
No contributing guide indexed for this repository
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
Use the production example for Electrical and Computer Engineering, EEC 001 - 001, Fall 2017 to reproduce the discrepancy. Trace the Scheduling view activity list and compare it with the calendar data and rendering path. Done means mass-imported activities appear consistently in both places.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- angularjs, javascript
- Domain
- frontend
- Issue type
- Bug
- Difficulty
- 4/5
- Estimated time
- 3-5 days
- Activity status
- Stale
- Clarity
- Needs clarification
- Newbie friendliness
- 25/100