temporalio / temporalio/temporal-worker-controller
Add validation during Ramping phase
Open
Nobody has claimed this yet.
crd-change
safety
- Dominant language
- Go
- Stars
- 187
- Forks
- 70
- Avg merge
- 4d 1h
- Merged PRs (30d)
- 31
Description
ie. track percentage of failed workflows on that build, and if it reaches some threshold, roll back.
Contributor guide
No contributing guide indexed for this repository
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
Start by locating the Ramping phase and the workflow failure tracking in the Go controller. Define how the failure percentage and threshold should be configured, then verify that reaching the threshold rolls back the build.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- go
- Domain
- backend
- Issue type
- Feature
- Difficulty
- 5/5
- Estimated time
- Over a week
- Activity status
- Stale
- Clarity
- Needs clarification
- Newbie friendliness
- 30/100