[8.10] Readiness record — `evidence complete` declared, `release approved` tracked
Nobody has claimed this yet.
- Dominant language
- Rust
- Stars
- 3
- Forks
- 0
- PR merge metrics
- No merged PRs in 30d
Description
Plan reference: plan/glamsterdam-2026-09-05/issues/08-phase-8-network-soak-and-observability.md · Issue 8.10
Description
Record the readiness evidence after the soak: the tag, the commit SHA 8.9b passed, the per-layer KAT results, the soak window and snapshot set — and declare evidence complete, the phase's exit state. release approved is out of this issue's reach (D16).
Implementation Notes
docs/gloas-observability.md: one readiness section citing 8.9b's Decision Log entry and 8.8's snapshots; every fact is a reference, nothing is re-derived here.- Record
release approvedseparately as blocked, accountable role UNASSIGNED, decision owner (project sponsor) named as needed (Q1). Do not invent a name, do not self-approve, and never let the recorded gap read as approval. - If 8.8 restarted on a rebuild, the record names the final SHA only and links the superseded run.
Acceptance Criteria
-
docs/gloas-observability.mddeclaresevidence completewith tag, SHA, per-layer KAT results, soak window and snapshot set — all referencing 8.9b / 8.8 artifacts on that SHA. - The same record shows
release approvedas blocked, role UNASSIGNED, decision owner = project sponsor (Q1); satisfied by recording the blocked state, never by approval (D16). -
docs_freshnessgreen; no path is invented.
Testing Notes
documentation only.
Points: 1 · Type: chore · Priority: P0 · Scope: 0.5 day · Blocked by: #339 · Blocks: —
Contributor guide
No contributing guide indexed for this repository
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
Read plan/glamsterdam-2026-09-05/issues/08-phase-8-network-soak-and-observability.md, then inspect docs/gloas-observability.md and the referenced 8.9b Decision Log and 8.8 snapshot artifacts. Add the readiness section using references only, record release approved as blocked with role UNASSIGNED and project sponsor as decision owner, and run docs_freshness until it is green.
Written by the indexing model from the issue text.
Assessment
- Domain
- documentation
- Issue type
- Documentation
- Difficulty
- 2/5
- Estimated time
- Half a day
- Activity status
- Active
- Clarity
- Clearly specified
- Newbie friendliness
- 72/100