resque / resque/resque-pool

release 1.0.0 and follow semver

Open
#120 10 comments 0 reactions 0 assignees View on GitHub

Nobody has claimed this yet.

Dominant language
Ruby
Stars
456
Forks
149
Avg merge
9d 7h
Merged PRs (30d)
3

Description

Although we claim semver, we still don't have a version 1.0.0 (which is required for semver). :)

If everything goes well with the RC I pushed last night, I'll make that 0.5.0 next Tuesday. I've held off on v1.0.0 because of the many warts, but since I've been using this in production (as-is) for several years, I think those warts aren't enough to prohibit a first release.

What will hold off a public release is if there is if there are any backwards compatible changes that "need" to be made. I'd rather make them now than make a 1.0 release that is only supported for a couple of weeks/months (or backport bugfixes).

If there are no backwards-incompatible changes to be made, I'll just rename 0.5.0 as 1.0.0 a week or so after 0.5.0 is released.

Contributor guide

Open the contributing guide

First steps

  1. Read the whole issue, then the project's contributing guide.
  2. Comment on the issue to say you are picking it up — it saves two people doing the same work.
  3. Fork the repository and make your change on a branch.
  4. Open a pull request that references the issue number.

Research direction

No files, tests, or entry points are named. Review the issue discussion and current release state first, then determine whether any backwards-incompatible changes remain. Done means deciding that the release is ready and publishing or renaming it as version 1.0.0 according to semver.

Written by the indexing model from the issue text.

Assessment

Tech stack
ruby
Domain
release
Issue type
Feature
Difficulty
5/5
Estimated time
Over a week
Activity status
Stale
Clarity
Needs clarification
Newbie friendliness
25/100

Get new issues in your inbox

A short digest of beginner-friendly GitHub issues.