redhat-developer / redhat-developer/rhdh-plugin-export-overlays

[RHDH 2.1.0] Backstage 1.54.0 compatibility: icon-viewer

Open
#3,603 0 comments 0 reactions 0 assignees View on GitHub

Nobody has claimed this yet.

update-notification
Dominant language
TypeScript
Stars
9
Forks
72
Avg merge
3d 11h
Merged PRs (30d)
143

Description

Backstage version bump — action needed

RHDH 2.1.0 is targeting Backstage 1.54.0.
The icon-viewer workspace is currently on Backstage 1.48.3.

What you need to do
  1. Update your plugin in the upstream repository to be compatible with Backstage 1.54.0
  2. Once updated, the daily update workflow will automatically create a PR in this repo to update the workspace reference
  3. Alternatively, you can trigger the update workflow yourself. See https://github.com/redhat-developer/rhdh-plugin-export-overlays/wiki/Metadata-Synchronization#automated-synchronization for more:
Timeline
Milestone Date
Feature freeze 2026-09-22
Details
Field Value
Workspace workspaces/icon-viewer
Upstream repo https://github.com/proberaum/backstage-plugins
Current Backstage version 1.48.3
Target Backstage version 1.54.0
Resources

cc @redhat-developer/rhdh-ui, @christoph-jerolimov

Contributor guide

No contributing guide indexed for this repository

First steps

  1. Read the whole issue, then the project's contributing guide.
  2. Comment on the issue to say you are picking it up — it saves two people doing the same work.
  3. Fork the repository and make your change on a branch.
  4. Open a pull request that references the issue number.

Research direction

Start with the workspaces/icon-viewer workspace and the upstream proberaum/backstage-plugins repository. Review the version updates guide and plugin owner responsibilities, then update the upstream plugin for Backstage 1.54.0. The work is done when the daily update workflow creates, or you trigger, a PR updating the workspace reference in this repository.

Written by the indexing model from the issue text.

Assessment

Tech stack
typescript
Domain
developer-experience
Issue type
Refactor
Difficulty
3/5
Estimated time
1-2 days
Activity status
Active
Clarity
Clearly specified
Newbie friendliness
68/100

Get new issues in your inbox

A short digest of beginner-friendly GitHub issues.