projectM-visualizer / projectM-visualizer/projectm

[INFO] Tracking projectM in Downstream Package Ecosystem

Open
#774 13 comments 0 reactions 0 assignees View on GitHub

Nobody has claimed this yet.

3rd-party-integration
Dominant language
C++
Stars
4.5k
Forks
485
Avg merge
3d 7h
Merged PRs (30d)
5

Description

projectm is split into 2 projects (projectm and projectm-eval) on repology:

Packaging status
Packaging status for projecctm-eval

There is an open request to merge them into 1 project under projectm

Also I have begun to bump downstream repos to update to 4.0.0
Example Alpine testing (see below)

TODO

Contributor guide

No contributing guide indexed for this repository

First steps

  1. Read the whole issue, then the project's contributing guide.
  2. Comment on the issue to say you are picking it up — it saves two people doing the same work.
  3. Fork the repository and make your change on a branch.
  4. Open a pull request that references the issue number.

Research direction

Review the Repology pages for projectm and projectm-eval, then inspect the Alpine package entry and the freshcode.club project record linked in the issue. Confirm the downstream 4.0.0 update status and complete or update the remaining Alpine item in the tracking checklist.

Written by the indexing model from the issue text.

Assessment

Tech stack
cpp
Domain
release
Issue type
Documentation
Difficulty
4/5
Estimated time
3-5 days
Activity status
Quiet
Clarity
Mostly clear
Newbie friendliness
35/100

Get new issues in your inbox

A short digest of beginner-friendly GitHub issues.