project-chip / project-chip/matter-test-scripts
[TC-EPM-1.1] EPM.S.F01 in PICS that can't match step 3 of test plan (Matter 1.3)
Open
Nobody has claimed this yet.
- Dominant language
- Python
- Stars
- 19
- Forks
- 7
- Avg merge
- 3d 17h
- Merged PRs (30d)
- 3
Description
Summary Title:
[TC-EPM-1.1] EPM.S.F01 in PICS that can't match step 3 of test plan (Matter 1.3)
Description:
The Vendor's DUT supports alternating current, so they select EPM.S.F01 in PICS.
When we test TC-EPM-1.1 on step 3 that feature-map is 2.
But expected outcome on test plan (Matter 1.3) shall be 1.
If want to feature-map is 1, vendor must select EPM.S.F00 in PICS, but that is not match DUT Spec
Steps to reproduce:
Step 3
Logs:
[TC-EPM-1_1.log](https://github.com/user-attachments/files/19334693/TC-EPM-1_1.log)
Additional Info:
PICS Version No:V_27_Issues_Fixed_SVE_1.3
Test plan version: Matter V1.3
Contributor guide
No contributing guide indexed for this repository
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
Start by locating TC-EPM-1.1 and reviewing step 3 alongside the attached TC-EPM-1_1.log. Compare the Matter 1.3 test-plan expectation of feature-map 1 with the PICS selections EPM.S.F00 and EPM.S.F01 and the DUT specification. Done means the test behavior and expected outcome consistently reflect the supported alternating-current configuration.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- python
- Domain
- testing-qa
- Issue type
- Bug
- Difficulty
- 4/5
- Estimated time
- 3-5 days
- Activity status
- Stale
- Clarity
- Needs clarification
- Newbie friendliness
- 35/100