pingcap / pingcap/tiflash

Query can't not be canceled normally in the tiflash network partition scenario

Open
#7,800 1 comment 0 reactions 0 assignees View on GitHub

Nobody has claimed this yet.

affects-7.5 affects-8.1 affects-8.5 component/compute may-affects-5.2 may-affects-5.3 may-affects-5.4 may-affects-6.1 may-affects-6.5 may-affects-7.1 severity/major type/bug
Dominant language
C++
Stars
1k
Forks
423
Avg merge
1d 15h
Merged PRs (30d)
24

Description

Bug Report

Please answer these questions before submitting your issue. Thanks!

1. Minimal reproduce step (Required)

ch worload
network partition chaos between 2 tiflashs for some time and delete the chaos
image

2. What did you expect to see? (Required)
3. What did you see instead (Required)
4. What is your TiFlash version? (Required)

In the release-6.5 branch

Contributor guide

No contributing guide indexed for this repository

First steps

  1. Read the whole issue, then the project's contributing guide.
  2. Comment on the issue to say you are picking it up — it saves two people doing the same work.
  3. Fork the repository and make your change on a branch.
  4. Open a pull request that references the issue number.

Research direction

No source files, tests, or entry points are named. Start by reproducing the reported workload with a network partition between two TiFlash instances, then verify that queries can be canceled normally after the partition is removed.

Written by the indexing model from the issue text.

Assessment

Tech stack
cpp
Domain
databases
Issue type
Bug
Difficulty
4/5
Estimated time
3-5 days
Activity status
Stale
Clarity
Needs clarification
Newbie friendliness
20/100

Get new issues in your inbox

A short digest of beginner-friendly GitHub issues.