Task evaluation plots defect
Nobody has claimed this yet.
- Dominant language
- TypeScript
- Stars
- 33
- Forks
- 30
- Avg merge
- 2d 21h
- Merged PRs (30d)
- 6
Description
Switching measures increases the points per flow, but the points all lead to the same run.
So it appears it adds a new point for the new measure selected without removing the point of the previously selected measure.
The images show task 146804.



Contributor guide
No contributing guide indexed for this repository
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
No source file or test is named. Reproduce the issue using task 146804 by switching measures and observing the task evaluation plots; then trace the plot data update path. Done means changing measures no longer leaves points from the previously selected measure, and each plotted point leads to the correct run.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- react, typescript
- Domain
- frontend
- Issue type
- Bug
- Difficulty
- 3/5
- Estimated time
- 1-2 days
- Activity status
- Stale
- Clarity
- Mostly clear
- Newbie friendliness
- 38/100