openbikesensor / openbikesensor/openbikesensor.github.io
Instructions on probing important connections (before/after initial power-on)
Open
Nobody has claimed this yet.
content
- Dominant language
- HTML
- Stars
- 29
- Forks
- 37
- PR merge metrics
- No merged PRs in 30d
Description
Let's write some instructions how you can use a multimeter to probe whether your soldering job is good:
- What to measure (continuity) before powering for the first time
- What to measure (voltage) when parts or the whole OBS doesn't start up properly
- What to measure to exclude specific failures (GPS power, Display power, maybe SDA/SCL pullups...)
Contributor guide
No contributing guide indexed for this repository
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
Use the issue body as the scope for the documentation: cover continuity checks before first power-on, voltage checks when the OBS does not start, and checks for GPS power, display power, and SDA/SCL pull-ups. Done means the project has clear multimeter instructions for each listed situation; the target documentation file or page is not specified in the issue.
Written by the indexing model from the issue text.
Assessment
- Domain
- documentation
- Issue type
- Documentation
- Difficulty
- 3/5
- Estimated time
- 1-2 days
- Activity status
- Stale
- Clarity
- Mostly clear
- Newbie friendliness
- 48/100