oasisprotocol / oasisprotocol/oasis-core

Simulate network delays in E2E tests

Open
#828 0 comments 0 reactions 0 assignees View on GitHub

Nobody has claimed this yet.

c:testing p:1
Dominant language
Go
Stars
369
Forks
151
Avg merge
1d 3h
Merged PRs (30d)
6

Description

We should be able to inject network delays into connections between specific nodes in E2E tests.

Contributor guide

Open the contributing guide

First steps

  1. Read the whole issue, then the project's contributing guide.
  2. Comment on the issue to say you are picking it up — it saves two people doing the same work.
  3. Fork the repository and make your change on a branch.
  4. Open a pull request that references the issue number.

Research direction

The issue names no files, tests, or entry points. Start by locating the E2E test harness and the node-to-node connection setup, then determine how tests select specific nodes and configure network traffic. Done means an E2E test can inject a delay between chosen nodes and verify the resulting behavior.

Written by the indexing model from the issue text.

Assessment

Tech stack
go
Domain
distributed-systems, networking, testing-qa
Issue type
Feature
Difficulty
4/5
Estimated time
3-5 days
Activity status
Stale
Clarity
Needs clarification
Newbie friendliness
30/100

Get new issues in your inbox

A short digest of beginner-friendly GitHub issues.