nolte / nolte/pre-commit-hooks
Add project/portfolio.yml manifest (or portfolio: excluded marker)
Nobody has claimed this yet.
- Dominant language
- Python
- Stars
- 0
- Forks
- 0
- Avg merge
- 3d 10h
- Merged PRs (30d)
- 2
Description
Surfaced by the nolte/claude-shared portfolio audit 2026-07-24 (finding W1, Warning), carried unchanged from the retired 2026-07-03 audit and routed here through the continuous-improvement triage loop.
Finding
Per spec/portfolio/portfolio-management/ §Portfolio scope + §Capability inventory per repository, every non-archived, non-fork, non-opted-out nolte/* repository is a Portfolio-Member and MUST either ship a project/portfolio.yml manifest or declare portfolio: excluded at the top of CLAUDE.md with a one-line rationale.
pre-commit-hooks is unambiguously capability-bearing — a collection of reusable pre-commit hooks for the nolte portfolio, consumed remotely by downstream projects — and currently ships neither a manifest nor the opt-out marker.
Remediation (pick one)
- Bootstrap a
project/portfolio.yml— run/nolte-shared:portfolio-audit(Bootstrap operation) in this repo, drafted fromproject/mission.md+ the audience artefact (operator-reviewed before commit), or - Add
portfolio: excludedto the top ofCLAUDE.mdwith a one-line rationale, if this repo should stay out of the capability inventory.
Context
- Audit report:
nolte/claude-shared→.audits/portfolio/2026-07-24.md, finding W1. - No change was pushed to this repository by the audit; this issue is the reversible hand-off.
Contributor guide
No contributing guide indexed for this repository
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
Read project/mission.md and the audience artefact, then run /nolte-shared:portfolio-audit in bootstrap mode to review the proposed manifest. Choose the manifest or the portfolio: excluded marker based on whether pre-commit-hooks belongs in the capability inventory, and verify that the selected file and rationale are committed.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- git
- Domain
- documentation, tooling
- Issue type
- Documentation
- Difficulty
- 2/5
- Estimated time
- 1-3 hours
- Activity status
- Quiet
- Clarity
- Clearly specified
- Newbie friendliness
- 68/100