CI Reliability 2026-04-03
Open
Nobody has claimed this yet.
- Dominant language
- Shell
- Stars
- 57
- Forks
- 20
- PR merge metrics
- No merged PRs in 30d
Description
Failures in node-test-pull-request/72340 to node-test-pull-request/72437 that failed 2 or more PRs
(Generated with ncu-ci walk pr --stats=true --markdown reports/2026-04-03.md)
| UTC Time | RUNNING | SUCCESS | UNSTABLE | ABORTED | FAILURE | Green Rate |
|---|---|---|---|---|---|---|
| 2026-04-03 00:20 | 1 | 16 | 8 | 1 | 74 | 16.33% |
Open https://github.com/nodejs/reliability/blob/main/reports/2026-04-03.md to see failure details
Progress
-
Backing channel 'JNLP4-connect connection from ... is disconnected.(4) -
Failed to trigger node-test-commit(5) -
fatal: No rebase in progress?(4) -
ERROR: Step ‘Record fingerprints of files to track usage’ failed: no workspace for ...(2) -
Failed to trigger sub builds(2) -
sh: line 1: 429:: command not found(2) -
wpt/test-wasm-jsapi(4) -
client-proxy/test-use-env-proxy-cli-https(2) -
parallel/test-http2-close-while-writing(2) -
parallel/test-inspector-debug-end(2) -
parallel/test-inspector-exit-worker-in-wait-for-connection(2) -
parallel/test-net-socket-reset-send(2) -
parallel/test-net-socket-tos(2) -
sequential/test-net-better-error-messages-port(2) -
wpt/test-streams(2)
Contributor guide
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
Start with reports/2026-04-03.md and the linked node-test-pull-request jobs, then use the listed failure messages to trace each affected CI or test failure. Done means identifying fixes or explanations for the repeated failures and updating the Progress checklist as they are resolved.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- node.js, shell
- Domain
- ci-cd, devops, testing-qa
- Issue type
- Bug
- Difficulty
- 4/5
- Estimated time
- 3-5 days
- Activity status
- Quiet
- Clarity
- Needs clarification
- Newbie friendliness
- 35/100