CI Reliability 2025-08-27
Nobody has claimed this yet.
- Dominant language
- Shell
- Stars
- 57
- Forks
- 20
- PR merge metrics
- No merged PRs in 30d
Description
Failures in node-test-pull-request/68796 to node-test-pull-request/68893 that failed 2 or more PRs
(Generated with ncu-ci walk pr --stats=true --markdown reports/2025-08-27.md)
| UTC Time | RUNNING | SUCCESS | UNSTABLE | ABORTED | FAILURE | Green Rate |
|---|---|---|---|---|---|---|
| 2025-08-27 00:11 | 0 | 0 | 25 | 7 | 68 | 0.00% |
Open https://github.com/nodejs/reliability/blob/main/reports/2025-08-27.md to see failure details
Progress
-
Build timed out (after 30 minutes). Marking the build as failed.(6) -
Cannot run program "/bin/sh" (in directory "/home/iojs/build/workspace/node"): error=0, Failed to exec spawn helper: pid: 1574737, exit value: 1(2) -
fatal error: ld terminated with signal 9 [Killed](13) -
fatal: No rebase in progress?(2) -
parallel/test-inspector-network-fetch(20) -
parallel/test-fastutf8stream-flush-mocks(14) -
parallel/test-fastutf8stream-sync(14) -
parallel/test-max-old-space-size-percentage(13) -
parallel/test-fs-write-stream-eagain(5) -
parallel/test-http-outgoing-end-cork(5) -
wpt/test-streams(5) -
parallel/test-http-keep-alive-empty-line(4) -
parallel/test-buffer-tostring-rangeerror(3) -
parallel/test-buffer-zero-fill-reset(3) -
parallel/test-child-process-advanced-serialization-splitted-length-field(3) -
parallel/test-debugger-break(3) -
sequential/test-performance-eventloopdelay(3) -
parallel/test-crypto-dh-generate-keys(2) -
parallel/test-debugger-use-strict(2) -
parallel/test-debugger-watchers(2) -
parallel/test-http-client-close-with-default-agent(2) -
parallel/test-http2-close-while-writing(2) -
parallel/test-runner-mock-timers-scheduler(2) -
parallel/test-snapshot-reproducible(2)
Contributor guide
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
Start with reports/2025-08-27.md and the linked node-test-pull-request builds, then review the listed timeout, process, linker, rebase, and test failures. Use the generated ncu-ci walk pr --stats=true --markdown reports/2025-08-27.md command to reproduce the report if needed. Done means the repeated CI failure groups are investigated and the reliability checklist is resolved.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- shell
- Domain
- ci-cd, devops, testing-qa
- Issue type
- Bug
- Difficulty
- 5/5
- Estimated time
- Over a week
- Activity status
- Stale
- Clarity
- Needs clarification
- Newbie friendliness
- 20/100