CI Reliability 2025-06-18
Open
Nobody has claimed this yet.
- Dominant language
- Shell
- Stars
- 57
- Forks
- 20
- PR merge metrics
- No merged PRs in 30d
Description
Failures in node-test-pull-request/67411 to node-test-pull-request/67507 that failed 2 or more PRs
(Generated with ncu-ci walk pr --stats=true --markdown reports/2025-06-18.md)
| UTC Time | RUNNING | SUCCESS | UNSTABLE | ABORTED | FAILURE | Green Rate |
|---|---|---|---|---|---|---|
| 2025-06-18 00:11 | 1 | 0 | 21 | 6 | 72 | 0.00% |
Open https://github.com/nodejs/reliability/blob/main/reports/2025-06-18.md to see failure details
Progress
-
parallel/test-buffer-tostring-range(17) -
pummel/test-string-decoder-large-buffer(15) -
parallel/test-fs-watch-recursive-delete(11) -
parallel/test-fs-write-buffer-large(11) -
pummel/test-buffer-large-size-buffer-alloc-unsafe(6) -
parallel/test-config-file(5) -
parallel/test-fs-write-file-invalid-path(4) -
pummel/test-buffer-large-size-buffer-alloc-unsafe-slow(4) -
pummel/test-buffer-large-size-slowbuffer(4) -
sequential/test-tls-session-timeout(4) -
pummel/test-buffer-large-size-buffer-alloc(3) -
pummel/test-buffer-large-size-buffer-write(3) -
es-module/test-vm-contextified-script-leak(2) -
parallel/test-fs-write-negativeoffset(2) -
parallel/test-http2-close-while-writing(2) -
parallel/test-stream-readable-to-web(2) -
sequential/test-performance-eventloopdelay(2) -
Build timed out (after 30 minutes). Marking the build as failed.(6) -
Build timed out (after 60 minutes). Marking the build as failed.(2) -
fatal error: Killed signal terminated program cc1plus(3) -
Failed to trigger node-test-commit(2) -
sh: line 12: [: -gt: unary operator expected(2)
Contributor guide
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
Start with reports/2025-06-18.md and the linked CI jobs for the listed failures. Review the generated output from ncu-ci walk pr --stats=true --markdown reports/2025-06-18.md, then investigate each recurring test or infrastructure failure. Done means the identified failures are resolved and the progress checklist is updated.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- shell
- Domain
- ci-cd, devops, testing-qa
- Issue type
- Bug
- Difficulty
- 5/5
- Estimated time
- Over a week
- Activity status
- Stale
- Clarity
- Needs clarification
- Newbie friendliness
- 20/100