CI Reliability 2025-05-26
Open
Nobody has claimed this yet.
- Dominant language
- Shell
- Stars
- 57
- Forks
- 20
- PR merge metrics
- No merged PRs in 30d
Description
Failures in node-test-pull-request/66985 to node-test-pull-request/67088 that failed 2 or more PRs
(Generated with ncu-ci walk pr --stats=true --markdown reports/2025-05-26.md)
| UTC Time | RUNNING | SUCCESS | UNSTABLE | ABORTED | FAILURE | Green Rate |
|---|---|---|---|---|---|---|
| 2025-05-26 00:11 | 0 | 13 | 11 | 4 | 72 | 13.54% |
Open https://github.com/nodejs/reliability/blob/main/reports/2025-05-26.md to see failure details
Progress
-
Build timed out (after 30 minutes). Marking the build as failed.(6) -
Cannot run program "/bin/sh" (in directory "/home/iojs/build/workspace/node"): error=0, Failed to exec spawn helper: pid: 3297692, exit value: 1(3) -
Cannot run program "/bin/sh" (in directory "/home/iojs/build/workspace/node"): error=0, Failed to exec spawn helper: pid: 3306322, exit value: 1(3) -
Build timed out (after 60 minutes). Marking the build as failed.(2) -
fatal: No rebase in progress?(7) -
parallel/test-http2-debug(28) -
parallel/test-buffer-tostring-range(11) -
parallel/test-buffer-tostring-rangeerror(11) -
pummel/test-blob-slice-with-large-size(11) -
wpt/test-streams(6) -
async-hooks/test-emit-after-on-destroyed(5) -
parallel/test-buffer-writefloat(5) -
parallel/test-buffer-zero-fill-reset(5) -
parallel/test-child-process-advanced-serialization-splitted-length-field(5) -
parallel/test-child-process-constructor(5) -
parallel/test-runner-run-watch(5) -
parallel/test-stream-readable-to-web(5) -
async-hooks/test-improper-unwind(4) -
sequential/test-performance-eventloopdelay(3) -
sequential/test-tls-session-timeout(3)
Contributor guide
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
Start with reports/2025-05-26.md and the linked node-test-pull-request builds; the report was generated with ncu-ci walk pr --stats=true --markdown reports/2025-05-26.md. Review the repeated timeout, spawn, rebase, and test failures, with done defined as resolving or explaining the listed CI failures.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- node.js, shell
- Domain
- ci-cd, testing-qa
- Issue type
- Bug
- Difficulty
- 4/5
- Estimated time
- 3-5 days
- Activity status
- Stale
- Clarity
- Needs clarification
- Newbie friendliness
- 25/100