CI Reliability 2025-04-19
Open
Nobody has claimed this yet.
- Dominant language
- Shell
- Stars
- 57
- Forks
- 20
- PR merge metrics
- No merged PRs in 30d
Description
Failures in node-test-pull-request/66256 to node-test-pull-request/66355 that failed 2 or more PRs
(Generated with ncu-ci walk pr --stats=true --markdown reports/2025-04-19.md)
| UTC Time | RUNNING | SUCCESS | UNSTABLE | ABORTED | FAILURE | Green Rate |
|---|---|---|---|---|---|---|
| 2025-04-19 00:10 | 0 | 4 | 27 | 8 | 61 | 4.35% |
Open https://github.com/nodejs/reliability/blob/main/reports/2025-04-19.md to see failure details
Progress
-
Build timed out (after 30 minutes). Marking the build as failed.(5) -
Build timed out (after 60 minutes). Marking the build as failed.(2) -
Error: list index out of range(10) -
error C1060: compiler is out of heap space [C:\workspace\node-compile-windows\node\tools\v8_gypfiles\v8_initializers.vcxproj](5) -
error C2065: 'NoArrayBufferZeroFillScope': undeclared identifier [C:\workspace\node-compile-windows\node\libnode.vcxproj](5) -
error C1060: compiler is out of heap space [C:\workspace\node-compile-windows-debug\node\tools\v8_gypfiles\v8_turboshaft.vcxproj](4) -
error: remote GitHub already exists.(3) -
Failed to trigger node-test-commit(2) -
error C1060: compiler is out of heap space [C:\workspace\node-compile-windows\node\tools\v8_gypfiles\v8_initializers_host.vcxproj](2) -
fatal error: Killed signal terminated program cc1plus(2) -
fatal: No rebase in progress?(2) -
parallel/test-file-write-stream4(6) -
sequential/test-performance-eventloopdelay(3) -
parallel/test-buffer-tostring-rangeerror(2) -
parallel/test-debugger-break(2) -
parallel/test-debugger-heap-profiler(2) -
parallel/test-runner-plan(2)
Contributor guide
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
Start with reports/2025-04-19.md and the linked node-test-pull-request builds 66256–66355; group the listed timeout, compiler, trigger, and test failures by cause. Done means the recurring failures are addressed and the CI report no longer shows them.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- nodejs, shell
- Domain
- ci-cd, devops, testing-qa
- Issue type
- Bug
- Difficulty
- 4/5
- Estimated time
- 3-5 days
- Activity status
- Stale
- Clarity
- Needs clarification
- Newbie friendliness
- 25/100