CI Reliability 2025-04-15
Open
Nobody has claimed this yet.
- Dominant language
- Shell
- Stars
- 57
- Forks
- 20
- PR merge metrics
- No merged PRs in 30d
Description
Failures in node-test-pull-request/66170 to node-test-pull-request/66269 that failed 2 or more PRs
(Generated with ncu-ci walk pr --stats=true --markdown reports/2025-04-15.md)
| UTC Time | RUNNING | SUCCESS | UNSTABLE | ABORTED | FAILURE | Green Rate |
|---|---|---|---|---|---|---|
| 2025-04-15 00:10 | 2 | 0 | 33 | 6 | 59 | 0.00% |
Open https://github.com/nodejs/reliability/blob/main/reports/2025-04-15.md to see failure details
Progress
-
pummel/test-buffer-large-size(11) -
parallel/test-runner-plan(7) -
parallel/test-file-write-stream4(5) -
parallel/test-debugger-heap-profiler(3) -
sequential/test-tls-session-timeout(3) -
parallel/test-crypto-authenticated(2) -
parallel/test-debugger-break(2) -
parallel/test-stream-readable-unpipe-resume(2) -
sequential/test-performance-eventloopdelay(2) -
Build timed out (after 30 minutes). Marking the build as failed.(3) -
Build timed out (after 60 minutes). Marking the build as failed.(2) -
ERROR: Error fetching remote repo 'origin'(3) -
error C2065: 'NoArrayBufferZeroFillScope': undeclared identifier [C:\workspace\node-compile-windows\node\libnode.vcxproj](8) -
Error: list index out of range(7) -
error C1060: compiler is out of heap space [C:\workspace\node-compile-windows\node\tools\v8_gypfiles\v8_initializers.vcxproj](4) -
error: remote GitHub already exists.(4) -
ERROR: The process with PID 9828 (child process of PID 10148) could not be terminated.(2) -
Failed to trigger node-test-commit(2) -
fatal: No rebase in progress?(2)
Contributor guide
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
Start with reports/2025-04-15.md and the linked Jenkins jobs for the listed failures. Use the documented ncu-ci walk pr --stats=true --markdown reports/2025-04-15.md command to review the failures, then investigate the test, build, and repository errors; done means the failures are addressed and the progress checklist is updated.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- git, github, node.js, shell
- Domain
- build-system, ci-cd, devops, testing-qa
- Issue type
- Bug
- Difficulty
- 4/5
- Estimated time
- 3-5 days
- Activity status
- Stale
- Clarity
- Needs clarification
- Newbie friendliness
- 25/100