CI Reliability 2025-02-24
Nobody has claimed this yet.
- Dominant language
- Shell
- Stars
- 57
- Forks
- 20
- PR merge metrics
- No merged PRs in 30d
Description
Failures in node-test-pull-request/65305 to node-test-pull-request/65397 that failed 2 or more PRs
(Generated with ncu-ci walk pr --stats=true --markdown reports/2025-02-24.md)
| UTC Time | RUNNING | SUCCESS | UNSTABLE | ABORTED | FAILURE | Green Rate |
|---|---|---|---|---|---|---|
| 2025-02-24 00:10 | 4 | 12 | 19 | 19 | 46 | 15.58% |
Open https://github.com/nodejs/reliability/blob/main/reports/2025-02-24.md to see failure details
Progress
-
error C1060: compiler is out of heap space [C:\workspace\node-compile-windows\node\tools\v8_gypfiles\v8_initializers.vcxproj](7) -
Error: EBUSY: resource busy or locked, rmdir '\\?\c:\workspace\node-test-binary-windows-js-suites\node\test\.tmp.638'(2) -
fatal: No rebase in progress?(2) -
parallel/test-assert-fail(9) -
parallel/test-runner-run-watch(8) -
parallel/test-file-write-stream4(6) -
parallel/test-http-server-headers-timeout-keepalive(3) -
parallel/test-runner-output(3) -
parallel/test-http-get-pipeline-problem(2) -
parallel/test-zlib-brotli-16GB(2) -
sequential/test-perf-hooks(2)
Contributor guide
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
Start with reports/2025-02-24.md and the linked node-test-pull-request jobs, then inspect the listed Progress failures. The issue names compiler, cleanup, rebase, and test failures but does not identify files or fixes. Done means the reported CI failures are investigated and the affected jobs return reliably without recurring failures.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- node.js, shell
- Domain
- ci-cd, devops, testing-qa
- Issue type
- Bug
- Difficulty
- 4/5
- Estimated time
- 3-5 days
- Activity status
- Stale
- Clarity
- Mostly clear
- Newbie friendliness
- 25/100