CI Reliability 2025-01-28
Open
Nobody has claimed this yet.
- Dominant language
- Shell
- Stars
- 57
- Forks
- 20
- PR merge metrics
- No merged PRs in 30d
Description
Failures in node-test-pull-request/64685 to node-test-pull-request/64778 that failed 2 or more PRs
(Generated with ncu-ci walk pr --stats=true --markdown reports/2025-01-28.md)
| UTC Time | RUNNING | SUCCESS | UNSTABLE | ABORTED | FAILURE | Green Rate |
|---|---|---|---|---|---|---|
| 2025-01-28 00:09 | 5 | 11 | 16 | 6 | 62 | 12.36% |
Open https://github.com/nodejs/reliability/blob/main/reports/2025-01-28.md to see failure details
Progress
-
parallel/test-permission-fs-read(21) -
parallel/test-permission-fs-write(21) -
parallel/test-fs-cp(14) -
parallel/test-cluster-fork-stdio(9) -
parallel/test-cluster-concurrent-disconnect(6) -
parallel/test-net-write-fully-async-hex-string(6) -
parallel/test-without-async-context-frame(6) -
es-module/test-wasm-web-api(5) -
parallel/test-cluster-disconnect-unshared-tcp(4) -
parallel/test-net-write-fully-async-buffer(4) -
parallel/test-watch-mode-files_watcher(4) -
parallel/test-buffer-tostring-rangeerror(3) -
parallel/test-esm-loader-hooks-inspect-wait(3) -
parallel/test-file-write-stream4(2) -
parallel/test-fs-watch-recursive-delete(2) -
parallel/test-stream-readable-unpipe-resume(2) -
Build timed out (after 30 minutes). Marking the build as failed.(5) -
ERROR: Error fetching remote repo 'origin'(3) -
Error: invalid syntax(3) -
fatal: No rebase in progress?(3) -
error C1060: compiler is out of heap space [C:\workspace\node-compile-windows\node\tools\v8_gypfiles\v8_initializers.vcxproj](2) -
sh: line 12: [: -gt: unary operator expected(2)
Contributor guide
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
Start by reviewing reports/2025-01-28.md and the linked node-test-pull-request builds for the repeated failures. Investigate the listed test names and CI errors, then verify that the relevant failures are resolved and the CI green rate improves.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- shell
- Domain
- ci-cd
- Issue type
- Bug
- Difficulty
- 4/5
- Estimated time
- 3-5 days
- Activity status
- Stale
- Clarity
- Needs clarification
- Newbie friendliness
- 25/100