nodejs / nodejs/reliability

CI Reliability 2025-01-26

Open
#1,095 0 comments 0 reactions 0 assignees View on GitHub

Nobody has claimed this yet.

Dominant language
Shell
Stars
57
Forks
20
PR merge metrics
No merged PRs in 30d

Description

Failures in node-test-pull-request/64654 to node-test-pull-request/64750 that failed 2 or more PRs
(Generated with ncu-ci walk pr --stats=true --markdown reports/2025-01-26.md)

UTC Time RUNNING SUCCESS UNSTABLE ABORTED FAILURE Green Rate
2025-01-26 00:10 0 14 17 12 57 15.91%

Open https://github.com/nodejs/reliability/blob/main/reports/2025-01-26.md to see failure details

Progress
  • Build timed out (after 30 minutes). Marking the build as failed. (6)
  • Build timed out (after 60 minutes). Marking the build as failed. (3)
  • ERROR: Error fetching remote repo 'origin' (3)
  • fatal: No rebase in progress? (5)
  • Error: invalid syntax (4)
  • error C1060: compiler is out of heap space [C:\workspace\node-compile-windows\node\tools\v8_gypfiles\v8_initializers.vcxproj] (2)
  • parallel/test-permission-fs-read (16)
  • parallel/test-permission-fs-write (16)
  • parallel/test-fs-cp (13)
  • parallel/test-cluster-concurrent-disconnect (9)
  • parallel/test-cluster-fork-stdio (9)
  • parallel/test-cluster-disconnect-unshared-tcp (8)
  • parallel/test-without-async-context-frame (6)
  • es-module/test-wasm-web-api (5)
  • parallel/test-net-write-fully-async-buffer (4)
  • parallel/test-net-write-fully-async-hex-string (4)
  • es-module/test-esm-loader-entry-url (2)
  • parallel/test-buffer-tostring-rangeerror (2)
  • parallel/test-esm-loader-hooks-inspect-wait (2)
  • parallel/test-file-write-stream4 (2)
  • parallel/test-fs-watch-recursive-delete (2)

Contributor guide

Open the contributing guide

First steps

  1. Read the whole issue, then the project's contributing guide.
  2. Comment on the issue to say you are picking it up — it saves two people doing the same work.
  3. Fork the repository and make your change on a branch.
  4. Open a pull request that references the issue number.

Research direction

Start with reports/2025-01-26.md and the node-test-pull-request jobs 64654 through 64750, using the listed failure messages and test names to group recurring failures. Review how the report was generated with ncu-ci walk pr --stats=true --markdown reports/2025-01-26.md; done means the recurring failures in the Progress checklist have documented resolutions or are otherwise cleared.

Written by the indexing model from the issue text.

Assessment

Tech stack
shell
Domain
ci-cd, testing-qa
Issue type
Bug
Difficulty
5/5
Estimated time
Over a week
Activity status
Stale
Clarity
Needs clarification
Newbie friendliness
25/100

Get new issues in your inbox

A short digest of beginner-friendly GitHub issues.