microsoft / microsoft/sre-agent
[Issue] Scheduled task loses “Response Subagent” option after editing
Nobody has claimed this yet.
- Dominant language
- PowerShell
- Stars
- 160
- Forks
- 97
- Avg merge
- 2d 5h
- Merged PRs (30d)
- 12
Description
Issue Description
When creating a scheduled task, there is an option to select a Response Subagent. However, after the task is created, editing its configuration causes this option to disappear. As a result, it is no longer possible to view, change, or assign a Response Subagent to the task.
Steps to Reproduce
- Create a new scheduled task
- Select a Response Subagent during creation
- Save the task
- Open the task and edit its configuration
Expected Behavior
The option to view and modify the assigned Response Subagent should remain available when editing the task.
Actual Behavior
The Response Subagent option is no longer visible after the task is created, making it impossible to modify or assign one.
Contributor guide
No contributing guide indexed for this repository
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
Start by reproducing the issue through the scheduled task creation and edit flow, using the reported steps to compare the Response Subagent option before and after saving. Done means the option remains visible when editing, and assigned subagents can be viewed, changed, or added.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- powershell
- Domain
- frontend
- Issue type
- Bug
- Difficulty
- 3/5
- Estimated time
- 1-2 days
- Activity status
- Quiet
- Clarity
- Mostly clear
- Newbie friendliness
- 48/100