mandiant / mandiant/macos-UnifiedLogs
Prep for v0.7.0 Release
Nobody has claimed this yet.
- Dominant language
- Rust
- Stars
- 376
- Forks
- 43
- Avg merge
- 1d 21h
- Merged PRs (30d)
- 8
Description
Based on rumors [ios27](https://9to5mac.com/2026/08/25/ios-27-release-date-when-next-major-iphone-update-is-coming/) and [golden gate](https://www.macrumors.com/2026/08/25/macos-golden-gate-release-date/) will likely be released around September 14.
It would be nice to release an updated version of the library prior to the release date to have initial support for the latest version of the Unified Log format.
There could be further changes in the finalized release of Golden Gate or iOS 27. But having at least initial support I think is good prior to the release dates.
@dgmcdona and @lukbukkit Just curious, you both have played around a bit with the beta versions of Golden Gate and iOS 27.
Have either of you encountered any additional bugs/issues with this library?
@jrouaix also curious if you have experimented with the Apple beta versions?
If no additional bugs/issues related to Golden Gate or iOS 27 have been seen. I am inclined to release a new version sooner vs closer to Sept 14.
Contributor guide
No contributing guide indexed for this repository
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
Start by reviewing the library's current Unified Log format support and the linked iOS 27 and macOS Golden Gate release information. Check beta behavior with the contributors named in the issue, identify compatibility changes needed for initial support, and verify the finalized formats before cutting v0.7.0.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- rust
- Domain
- operating-systems, release
- Issue type
- Feature
- Difficulty
- 4/5
- Estimated time
- 3-5 days
- Activity status
- Active
- Clarity
- Needs clarification
- Newbie friendliness
- 45/100