lmstudio-ai / lmstudio-ai/docs

AMI FRAOCH

Open
#231 0 comments 0 reactions 0 assignees View on GitHub
Dominant language
MDX
Stars
172
Forks
128
Avg merge
8m
Merged PRs (30d)
1

Description

contexte: Nous avons un appel à projet avec les annexe. nous souhaontons tenir la première seance technique en consortium. en tant que bussines developpement manger, fait un resumé du dossier avec les points clés, les criètères sensibles pour une bonne appropriation du dossier.[_FHRAO~1.PDF](https://github.com/user-attachments/files/29099213/_FHRAO.1.PDF)
[\[FHRAOC\] Annexe 13. Directives en matière de visibilité 1.pdf](https://github.com/user-attachments/files/29099216/FHRAOC.Annexe.13.Directives.en.matiere.de.visibilite.1.pdf)
[\[FHRAOC\] Manuel Opérationnel_Avril 2025 1.pdf](https://github.com/user-attachments/files/29099218/FHRAOC.Manuel.Operationnel_Avril.2025.1.pdf)
[20240711_FHRAOC_Canevas de plan de renforcement des capacités 2.docx](https://github.com/user-attachments/files/29099214/20240711_FHRAOC_Canevas.de.plan.de.renforcement.des.capacites.2.docx)
[202506~2.PDF](https://github.com/user-attachments/files/29099215/202506.2.PDF)
[202506~1.PDF](https://github.com/user-attachments/files/29099219/202506.1.PDF)
[FHRAOC_Formulaire pour développer un budget 1.xlsx](https://github.com/user-attachments/files/29099212/FHRAOC_Formulaire.pour.developper.un.budget.1.xlsx)
[FINAL_Note-strategique-SA1-Burkina Faso.pdf](https://github.com/user-attachments/files/29099217/FINAL_Note-strategique-SA1-Burkina.Faso.pdf)

Contributor guide

Open the contributing guide

Research direction

Start by reviewing the attached FHRAOC call documents, operational manual, visibility directives, capacity-building template, budget workbook, and Burkina Faso strategic note. Identify where the resulting summary should live in the repository and confirm the required language and format. Done means a reviewed dossier summary with key points and sensitive criteria for the consortium's first technical session.

Written by the indexing model from the issue text.

Assessment

Domain
documentation
Issue type
Documentation
Difficulty
4/5
Estimated time
3-5 days
Activity status
Quiet
Clarity
Needs clarification
Newbie friendliness
30/100

Get new issues in your inbox

A short digest of beginner-friendly GitHub issues.