An in-range update of async is breaking the build 🚨
Nobody has claimed this yet.
- Dominant language
- JavaScript
- Stars
- 15
- Forks
- 4
- PR merge metrics
- No merged PRs in 30d
Description
Version 2.6.0 of async was just published.
| Branch | Build failing 🚨 |
|---|---|
| Dependency | async |
| Current Version | 2.5.0 |
| Type | dependency |
This version is covered by your current version range and after updating it in your project the build failed.
async is a direct dependency of this project, and it is very likely causing it to break. If other packages depend on yours, this update is probably also breaking those in turn.
Status Details
- ✅ coverage/coveralls First build on greenkeeper/async-2.6.0 at 12.808% Details
- ✅ ci/circleci Your tests passed on CircleCI! Details
- ✅ continuous-integration/appveyor/branch AppVeyor build succeeded Details
- ❌ codecov/project 12.31% (-0.5%) compared to fe5bfde Details
- ✅ codecov/patch Coverage not affected when comparing fe5bfde...66914d9 Details
FAQ and help
There is a collection of frequently asked questions. If those don’t help, you can always ask the humans behind Greenkeeper.
Your Greenkeeper Bot 🌴
Contributor guide
No contributing guide indexed for this repository
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
Start with the greenkeeper/async-2.6.0 branch and compare it with the current project state. Check the linked CircleCI, AppVeyor, Coveralls, and Codecov results to determine whether the dependency update actually breaks the build; done means the failure is reproduced and resolved, or the issue is closed if the reported build is healthy.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- javascript
- Domain
- build-system, ci-cd
- Issue type
- Bug
- Difficulty
- 3/5
- Estimated time
- 1-2 days
- Activity status
- Stale
- Clarity
- Needs clarification
- Newbie friendliness
- 20/100